Burundi vs Cabo Verde: Time required to deal with construction permits
Burundi
99 days
in 2012
Cabo Verde
122 days
in 2012
Burundi rank
43rd
Cabo Verde rank
40th
Time required to deal with construction permits over time
- Burundi
- Cabo Verde
How they compare
Cabo Verde currently reports 122 days against 99 days in Burundi, a difference of 23 days.
That makes Cabo Verde's figure about 1.2 times Burundi's.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Burundi ahead.
Burundi ranks 43rd and Cabo Verde ranks 40th of 50 countries.
Burundi has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Burundi | Cabo Verde | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 135 days | 122 days | 13 days | Burundi |
| 2010s | 123.67 days | 122 days | 1.67 days | Burundi |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Burundi or Cabo Verde?
- Cabo Verde, at 122 days against 99 days in Burundi as of 2012.
- What is the difference in time required to deal with construction permits between Burundi and Cabo Verde?
- 23 days, with Cabo Verde ahead.
- How many years of comparable data are there for Burundi and Cabo Verde?
- 8 years are reported by both, from 2005 to 2012.
- How do Burundi and Cabo Verde rank globally for time required to deal with construction permits?
- Burundi ranks 43rd and Cabo Verde ranks 40th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.