Time required to deal with construction permits in Burundi

Burundi: Time required to deal with construction permits was 99 days in 2012. ▼ Falling

Latest (2012)
99 days
Change on year
down 27.7%
World rank
43rd
of 50 countries
All-time high
137 days
in 2011
All-time low
99 days
in 2012
Years of data
8
2005–2012

Time required to deal with construction permits in Burundi, 2005–2012

0501001502005200820122005: 135 days2006: 135 days2007: 135 days2008: 135 days2009: 135 days2010: 135 days2011: 137 days2012: 99 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Burundi is 99 days, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 27.7% on the previous year and down 26.7% over ten years.

That places Burundi 43rd out of 50 countries with data for 2012, putting it in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 135 days 135 days 135 days 5
2010s 123.67 days 99 days 137 days 3

Countries ranked near Burundi

  1. 40 Cape Verde 122 days compare
  2. 41 Sao Tome and Principe 118 days compare
  3. 42 Democratic Republic of Congo 117 days compare
  4. 44 Burkina Faso 98 days compare
  5. 45 Morocco 97 days compare
  6. 46 Eswatini 95 days compare

See the full ranking of 56 places →

More private sector data for Burundi

All data for Burundi →

Frequently asked questions

What is time required to deal with construction permits in Burundi?
Time required to deal with construction permits in Burundi was 99 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Burundi?
The highest recorded value was 137 days in 2011.
What is the lowest time required to deal with construction permits recorded in Burundi?
The lowest recorded value was 99 days in 2012.
How does Burundi rank for time required to deal with construction permits?
Burundi ranks 43rd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Burundi?
Over the last ten years it is down 26.7%. The long-run trend across the full record is falling.
Where does this Burundi data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.