Burundi vs Congo, Democratic Republic of the: Time required to deal with construction permits

Burundi
99 days
in 2012
Congo, Democratic Republic of the
117 days
in 2012
Burundi rank
43rd
Congo, Democratic Republic of the rank
42nd

Time required to deal with construction permits over time

  • Burundi
  • Congo, Democratic Republic of the
0100200300200520082012

How they compare

Congo, Democratic Republic of the currently reports 117 days against 99 days in Burundi, a difference of 18 days.

That makes Congo, Democratic Republic of the's figure about 1.2 times Burundi's.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Congo, Democratic Republic of the ahead.

Burundi ranks 43rd and Congo, Democratic Republic of the ranks 42nd of 50 countries.

Across the 2 decades both report, Burundi averaged higher in 1 and Congo, Democratic Republic of the in 1.

Head to head by decade

Decade Burundi Congo, Democratic Republic of the Difference Ahead
2000s 135 days 250.6 days 115.6 days Congo, Democratic Republic of the
2010s 123.67 days 117 days 6.67 days Burundi

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Burundi or Congo, Democratic Republic of the?
Congo, Democratic Republic of the, at 117 days against 99 days in Burundi as of 2012.
What is the difference in time required to deal with construction permits between Burundi and Congo, Democratic Republic of the?
18 days, with Congo, Democratic Republic of the ahead.
How many years of comparable data are there for Burundi and Congo, Democratic Republic of the?
8 years are reported by both, from 2005 to 2012.
How do Burundi and Congo, Democratic Republic of the rank globally for time required to deal with construction permits?
Burundi ranks 43rd and Congo, Democratic Republic of the ranks 42nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Burundi vs Congo, Democratic Republic of the: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burundi/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/burundi/congo-dem-rep/">Burundi vs Congo, Democratic Republic of the: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.