Burundi vs Congo, Democratic Republic of the: Time required to deal with construction permits
Burundi
99 days
in 2012
Congo, Democratic Republic of the
117 days
in 2012
Burundi rank
43rd
Congo, Democratic Republic of the rank
42nd
Time required to deal with construction permits over time
- Burundi
- Congo, Democratic Republic of the
How they compare
Congo, Democratic Republic of the currently reports 117 days against 99 days in Burundi, a difference of 18 days.
That makes Congo, Democratic Republic of the's figure about 1.2 times Burundi's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Congo, Democratic Republic of the ahead.
Burundi ranks 43rd and Congo, Democratic Republic of the ranks 42nd of 50 countries.
Across the 2 decades both report, Burundi averaged higher in 1 and Congo, Democratic Republic of the in 1.
Head to head by decade
| Decade | Burundi | Congo, Democratic Republic of the | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 135 days | 250.6 days | 115.6 days | Congo, Democratic Republic of the |
| 2010s | 123.67 days | 117 days | 6.67 days | Burundi |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Burundi or Congo, Democratic Republic of the?
- Congo, Democratic Republic of the, at 117 days against 99 days in Burundi as of 2012.
- What is the difference in time required to deal with construction permits between Burundi and Congo, Democratic Republic of the?
- 18 days, with Congo, Democratic Republic of the ahead.
- How many years of comparable data are there for Burundi and Congo, Democratic Republic of the?
- 8 years are reported by both, from 2005 to 2012.
- How do Burundi and Congo, Democratic Republic of the rank globally for time required to deal with construction permits?
- Burundi ranks 43rd and Congo, Democratic Republic of the ranks 42nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.