Burundi vs Sao Tome and Principe: Time required to deal with construction permits
Burundi
99 days
in 2012
Sao Tome and Principe
118 days
in 2012
Burundi rank
43rd
Sao Tome and Principe rank
41st
Time required to deal with construction permits over time
- Burundi
- Sao Tome and Principe
How they compare
Sao Tome and Principe currently reports 118 days against 99 days in Burundi, a difference of 19 days.
That makes Sao Tome and Principe's figure about 1.2 times Burundi's.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Sao Tome and Principe ahead.
Burundi ranks 43rd and Sao Tome and Principe ranks 41st of 50 countries.
Sao Tome and Principe has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Burundi | Sao Tome and Principe | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 135 days | 255 days | 120 days | Sao Tome and Principe |
| 2010s | 123.67 days | 163.67 days | 40 days | Sao Tome and Principe |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Burundi or Sao Tome and Principe?
- Sao Tome and Principe, at 118 days against 99 days in Burundi as of 2012.
- What is the difference in time required to deal with construction permits between Burundi and Sao Tome and Principe?
- 19 days, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Burundi and Sao Tome and Principe?
- 8 years are reported by both, from 2005 to 2012.
- How do Burundi and Sao Tome and Principe rank globally for time required to deal with construction permits?
- Burundi ranks 43rd and Sao Tome and Principe ranks 41st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.