Cabo Verde vs Democratic Republic of the Congo: Time required to deal with construction permits
Cabo Verde
122 days
in 2012
Democratic Republic of the Congo
117 days
in 2012
Cabo Verde rank
40th
Democratic Republic of the Congo rank
42nd
Time required to deal with construction permits over time
- Cabo Verde
- Democratic Republic of the Congo
How they compare
Cabo Verde currently reports 122 days against 117 days in Democratic Republic of the Congo, a difference of 5 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Democratic Republic of the Congo ahead.
Cabo Verde ranks 40th and Democratic Republic of the Congo ranks 42nd of 50 countries.
Across the 2 decades both report, Cabo Verde averaged higher in 1 and Democratic Republic of the Congo in 1.
Head to head by decade
| Decade | Cabo Verde | Democratic Republic of the Congo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 122 days | 250.6 days | 128.6 days | Democratic Republic of the Congo |
| 2010s | 122 days | 117 days | 5 days | Cabo Verde |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cabo Verde or Democratic Republic of the Congo?
- Cabo Verde, at 122 days against 117 days in Democratic Republic of the Congo as of 2012.
- What is the difference in time required to deal with construction permits between Cabo Verde and Democratic Republic of the Congo?
- 5 days, with Cabo Verde ahead.
- How many years of comparable data are there for Cabo Verde and Democratic Republic of the Congo?
- 8 years are reported by both, from 2005 to 2012.
- How do Cabo Verde and Democratic Republic of the Congo rank globally for time required to deal with construction permits?
- Cabo Verde ranks 40th and Democratic Republic of the Congo ranks 42nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.