Cape Verde vs Democratic Republic of Congo: Time required to deal with construction permits (days)
Cape Verde
122 days
in 2012
Democratic Republic of Congo
117 days
in 2012
Cape Verde rank
40th
Democratic Republic of Congo rank
42nd
Time required to deal with construction permits (days) over time
- Cape Verde
- Democratic Republic of Congo
How they compare
Cape Verde currently reports 122 days against 117 days in Democratic Republic of Congo, a difference of 5 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Democratic Republic of Congo ahead.
Cape Verde ranks 40th and Democratic Republic of Congo ranks 42nd of 50 countries.
Across the 2 decades both report, Cape Verde averaged higher in 1 and Democratic Republic of Congo in 1.
Head to head by decade
| Decade | Cape Verde | Democratic Republic of Congo | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 122 days | 250.6 days | 128.6 days | Democratic Republic of Congo |
| 2010s | 122 days | 117 days | 5 days | Cape Verde |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cape Verde or Democratic Republic of Congo?
- Cape Verde, at 122 days against 117 days in Democratic Republic of Congo as of 2012.
- What is the difference in time required to deal with construction permits between Cape Verde and Democratic Republic of Congo?
- 5 days, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Democratic Republic of Congo?
- 8 years are reported by both, from 2005 to 2012.
- How do Cape Verde and Democratic Republic of Congo rank globally for time required to deal with construction permits?
- Cape Verde ranks 40th and Democratic Republic of Congo ranks 42nd of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.