Cabo Verde vs Democratic Republic of the Congo: Time required to deal with construction permits

Cabo Verde
122 days
in 2012
Democratic Republic of the Congo
117 days
in 2012
Cabo Verde rank
40th
Democratic Republic of the Congo rank
42nd

Time required to deal with construction permits over time

  • Cabo Verde
  • Democratic Republic of the Congo
0100200300200520082012

How they compare

Cabo Verde currently reports 122 days against 117 days in Democratic Republic of the Congo, a difference of 5 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Democratic Republic of the Congo ahead.

Cabo Verde ranks 40th and Democratic Republic of the Congo ranks 42nd of 50 countries.

Across the 2 decades both report, Cabo Verde averaged higher in 1 and Democratic Republic of the Congo in 1.

Head to head by decade

Decade Cabo Verde Democratic Republic of the Congo Difference Ahead
2000s 122 days 250.6 days 128.6 days Democratic Republic of the Congo
2010s 122 days 117 days 5 days Cabo Verde

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cabo Verde or Democratic Republic of the Congo?
Cabo Verde, at 122 days against 117 days in Democratic Republic of the Congo as of 2012.
What is the difference in time required to deal with construction permits between Cabo Verde and Democratic Republic of the Congo?
5 days, with Cabo Verde ahead.
How many years of comparable data are there for Cabo Verde and Democratic Republic of the Congo?
8 years are reported by both, from 2005 to 2012.
How do Cabo Verde and Democratic Republic of the Congo rank globally for time required to deal with construction permits?
Cabo Verde ranks 40th and Democratic Republic of the Congo ranks 42nd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cabo Verde vs Democratic Republic of the Congo: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cabo-verde/congo-dem-rep/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cabo-verde/congo-dem-rep/">Cabo Verde vs Democratic Republic of the Congo: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.