Cabo Verde vs Kenya: Time required to deal with construction permits
Cabo Verde
122 days
in 2012
Kenya
125 days
in 2012
Cabo Verde rank
40th
Kenya rank
38th
Time required to deal with construction permits over time
- Cabo Verde
- Kenya
How they compare
Kenya currently reports 125 days against 122 days in Cabo Verde, a difference of 3 days.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Kenya ahead.
Cabo Verde ranks 40th and Kenya ranks 38th of 50 countries.
Kenya has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cabo Verde | Kenya | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 122 days | 137.2 days | 15.2 days | Kenya |
| 2010s | 122 days | 125 days | 3 days | Kenya |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cabo Verde or Kenya?
- Kenya, at 125 days against 122 days in Cabo Verde as of 2012.
- What is the difference in time required to deal with construction permits between Cabo Verde and Kenya?
- 3 days, with Kenya ahead.
- How many years of comparable data are there for Cabo Verde and Kenya?
- 8 years are reported by both, from 2005 to 2012.
- How do Cabo Verde and Kenya rank globally for time required to deal with construction permits?
- Cabo Verde ranks 40th and Kenya ranks 38th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.