Cape Verde vs Sao Tome and Principe: Time required to deal with construction permits

Cape Verde
122 days
in 2012
Sao Tome and Principe
118 days
in 2012
Cape Verde rank
40th
Sao Tome and Principe rank
41st

Time required to deal with construction permits over time

  • Cape Verde
  • Sao Tome and Principe
0100200300200520082012

How they compare

Cape Verde currently reports 122 days against 118 days in Sao Tome and Principe, a difference of 4 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Sao Tome and Principe ahead.

Cape Verde ranks 40th and Sao Tome and Principe ranks 41st of 50 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cape Verde Sao Tome and Principe Difference Ahead
2000s 122 days 255 days 133 days Sao Tome and Principe
2010s 122 days 163.67 days 41.67 days Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cape Verde or Sao Tome and Principe?
Cape Verde, at 122 days against 118 days in Sao Tome and Principe as of 2012.
What is the difference in time required to deal with construction permits between Cape Verde and Sao Tome and Principe?
4 days, with Cape Verde ahead.
How many years of comparable data are there for Cape Verde and Sao Tome and Principe?
8 years are reported by both, from 2005 to 2012.
How do Cape Verde and Sao Tome and Principe rank globally for time required to deal with construction permits?
Cape Verde ranks 40th and Sao Tome and Principe ranks 41st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cape Verde vs Sao Tome and Principe: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 05 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cabo-verde/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cabo-verde/sao-tome-and-principe/">Cape Verde vs Sao Tome and Principe: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.