Cameroon vs Chad: Time required to deal with construction permits
Cameroon
147 days
in 2012
Chad
154 days
in 2012
Cameroon rank
29th
Chad rank
28th
Time required to deal with construction permits over time
- Cameroon
- Chad
How they compare
Chad currently reports 154 days against 147 days in Cameroon, a difference of 7 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Cameroon ahead.
Cameroon ranks 29th and Chad ranks 28th of 50 countries.
Across the 2 decades both report, Cameroon averaged higher in 1 and Chad in 1.
Head to head by decade
| Decade | Cameroon | Chad | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 159 days | 154 days | 5 days | Cameroon |
| 2010s | 147 days | 154 days | 7 days | Chad |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Cameroon or Chad?
- Chad, at 154 days against 147 days in Cameroon as of 2012.
- What is the difference in time required to deal with construction permits between Cameroon and Chad?
- 7 days, with Chad ahead.
- How many years of comparable data are there for Cameroon and Chad?
- 8 years are reported by both, from 2005 to 2012.
- How do Cameroon and Chad rank globally for time required to deal with construction permits?
- Cameroon ranks 29th and Chad ranks 28th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.