Cameroon vs Gambia: Time required to deal with construction permits

Cameroon
147 days
in 2012
Gambia
143 days
in 2012
Cameroon rank
29th
Gambia rank
31st

Time required to deal with construction permits over time

  • Cameroon
  • Gambia
050100150200520082012

How they compare

Cameroon currently reports 147 days against 143 days in Gambia, a difference of 4 days.

Across all 8 years both countries report, Cameroon has been ahead every year.

Cameroon ranks 29th and Gambia ranks 31st of 50 countries.

Cameroon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cameroon Gambia Difference Ahead
2000s 159 days 109 days 50 days Cameroon
2010s 147 days 143 days 4 days Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cameroon or Gambia?
Cameroon, at 147 days against 143 days in Gambia as of 2012.
What is the difference in time required to deal with construction permits between Cameroon and Gambia?
4 days, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Gambia?
8 years are reported by both, from 2005 to 2012.
How do Cameroon and Gambia rank globally for time required to deal with construction permits?
Cameroon ranks 29th and Gambia ranks 31st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cameroon vs Gambia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 23 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cameroon/gambia-the/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cameroon/gambia-the/">Cameroon vs Gambia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.