Time required to deal with construction permits in Gambia, The
Gambia, The: Time required to deal with construction permits was 143 days in 2012. β² Rising
Time required to deal with construction permits in Gambia, The, 2005β2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
In 2012, time required to deal with construction permits in Gambia, The stood at 143 days. That is the highest value across all 8 years on record.
Compared with earlier readings it is up 31.2% over ten years.
That places Gambia, The 31st out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 109 days | 109 days | 109 days | 5 |
| 2010s | 143 days | 143 days | 143 days | 3 |
Countries ranked near Gambia, The
More private sector data for Gambia, The
- Merchandise trade 54.3% (2025)
- Food imports 22.0% (2024)
- Manufactures imports 44.7% (2024)
- Merchandise imports 894.00 million current US$ (2025)
- Food exports 90.7% (2024)
- Manufactures exports 1.0% (2024)
- Merchandise exports 514.00 million current US$ (2025)
- Commercial service exports 484.54 million current US$ (2024)
- Transport services 66.7% (2024)
- Computer, communications and other services 6.5% (2024)
Frequently asked questions
- What is time required to deal with construction permits in Gambia, The?
- Time required to deal with construction permits in Gambia, The was 143 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Gambia, The?
- The highest recorded value was 143 days in 2010.
- What is the lowest time required to deal with construction permits recorded in Gambia, The?
- The lowest recorded value was 109 days in 2005.
- How does Gambia, The rank for time required to deal with construction permits?
- Gambia, The ranks 31st out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Gambia, The?
- Over the last ten years it is up 31.2%. The long-run trend across the full record is rising.
- Where does this Gambia, The data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV Β· JSON β 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.