Cameroon vs Guinea-Bissau: Time required to deal with construction permits

Cameroon
147 days
in 2012
Guinea-Bissau
163 days
in 2012
Cameroon rank
29th
Guinea-Bissau rank
27th

Time required to deal with construction permits over time

  • Cameroon
  • Guinea-Bissau
050100150200520082012

How they compare

Guinea-Bissau currently reports 163 days against 147 days in Cameroon, a difference of 16 days.

That makes Guinea-Bissau's figure about 1.1 times Cameroon's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Cameroon ahead.

Cameroon ranks 29th and Guinea-Bissau ranks 27th of 50 countries.

Guinea-Bissau has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cameroon Guinea-Bissau Difference Ahead
2000s 159 days 163 days 4 days Guinea-Bissau
2010s 147 days 163 days 16 days Guinea-Bissau

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cameroon or Guinea-Bissau?
Guinea-Bissau, at 163 days against 147 days in Cameroon as of 2012.
What is the difference in time required to deal with construction permits between Cameroon and Guinea-Bissau?
16 days, with Guinea-Bissau ahead.
How many years of comparable data are there for Cameroon and Guinea-Bissau?
8 years are reported by both, from 2005 to 2012.
How do Cameroon and Guinea-Bissau rank globally for time required to deal with construction permits?
Cameroon ranks 29th and Guinea-Bissau ranks 27th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cameroon vs Guinea-Bissau: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cameroon/guinea-bissau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cameroon/guinea-bissau/">Cameroon vs Guinea-Bissau: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.