Time required to deal with construction permits in Guinea-Bissau

Guinea-Bissau: Time required to deal with construction permits was 163 days in 2012. β–¬ Flat

Latest (2012)
163 days
Change on year
unchanged
World rank
27th
of 50 countries
All-time high
163 days
in 2005
All-time low
163 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Guinea-Bissau, 2005–2012

0501001502005200820122005: 163 days2006: 163 days2007: 163 days2008: 163 days2009: 163 days2010: 163 days2011: 163 days2012: 163 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Guinea-Bissau stood at 163 days. That is the highest value across all 8 years on record.

Compared with earlier readings it is unchanged over ten years.

Guinea-Bissau ranks 27th of 50 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 163 days 163 days 163 days 5
2010s 163 days 163 days 163 days 3

Countries ranked near Guinea-Bissau

  1. 25 Equatorial Guinea 166 days compare
  2. 26 Rwanda 164 days compare
  3. 28 Chad 154 days compare
  4. 29 Cameroon 147 days compare
  5. 30 Botswana 145 days compare

See the full ranking of 56 places β†’

More private sector data for Guinea-Bissau

All data for Guinea-Bissau β†’

Frequently asked questions

What is time required to deal with construction permits in Guinea-Bissau?
Time required to deal with construction permits in Guinea-Bissau was 163 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Guinea-Bissau?
The highest recorded value was 163 days in 2005.
What is the lowest time required to deal with construction permits recorded in Guinea-Bissau?
The lowest recorded value was 163 days in 2005.
How does Guinea-Bissau rank for time required to deal with construction permits?
Guinea-Bissau ranks 27th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Guinea-Bissau?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Guinea-Bissau data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Guinea-Bissau. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 16 August 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/guinea-bissau/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/guinea-bissau/">Time required to deal with construction permits in Guinea-Bissau</a> β€” Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.