Chad vs Equatorial Guinea: Time required to deal with construction permits

Chad
154 days
in 2012
Equatorial Guinea
166 days
in 2012
Chad rank
28th
Equatorial Guinea rank
25th

Time required to deal with construction permits over time

  • Chad
  • Equatorial Guinea
050100150200520082012

How they compare

Equatorial Guinea currently reports 166 days against 154 days in Chad, a difference of 12 days.

That makes Equatorial Guinea's figure about 1.1 times Chad's.

Across all 8 years both countries report, Equatorial Guinea has been ahead every year.

Chad ranks 28th and Equatorial Guinea ranks 25th of 50 countries.

Equatorial Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Chad Equatorial Guinea Difference Ahead
2000s 154 days 166 days 12 days Equatorial Guinea
2010s 154 days 166 days 12 days Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Chad or Equatorial Guinea?
Equatorial Guinea, at 166 days against 154 days in Chad as of 2012.
What is the difference in time required to deal with construction permits between Chad and Equatorial Guinea?
12 days, with Equatorial Guinea ahead.
How many years of comparable data are there for Chad and Equatorial Guinea?
8 years are reported by both, from 2005 to 2012.
How do Chad and Equatorial Guinea rank globally for time required to deal with construction permits?
Chad ranks 28th and Equatorial Guinea ranks 25th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.