Time required to deal with construction permits in Equatorial Guinea

Equatorial Guinea: Time required to deal with construction permits was 166 days in 2012. ▬ Flat

Latest (2012)
166 days
Change on year
unchanged
World rank
25th
of 50 countries
All-time high
166 days
in 2005
All-time low
166 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Equatorial Guinea, 2005–2012

0501001502005200820122005: 166 days2006: 166 days2007: 166 days2008: 166 days2009: 166 days2010: 166 days2011: 166 days2012: 166 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Equatorial Guinea is 166 days, measured in 2012. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

That places Equatorial Guinea 25th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 166 days 166 days 166 days 5
2010s 166 days 166 days 166 days 3

Countries ranked near Equatorial Guinea

  1. 22 Mali 179 days compare
  2. 23 Djibouti 172 days compare
  3. 23 Madagascar 172 days compare
  4. 26 Rwanda 164 days compare
  5. 27 Guinea-Bissau 163 days compare
  6. 28 Chad 154 days compare

See the full ranking of 56 places →

More private sector data for Equatorial Guinea

All data for Equatorial Guinea →

Frequently asked questions

What is time required to deal with construction permits in Equatorial Guinea?
Time required to deal with construction permits in Equatorial Guinea was 166 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Equatorial Guinea?
The highest recorded value was 166 days in 2005.
What is the lowest time required to deal with construction permits recorded in Equatorial Guinea?
The lowest recorded value was 166 days in 2005.
How does Equatorial Guinea rank for time required to deal with construction permits?
Equatorial Guinea ranks 25th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Equatorial Guinea?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Equatorial Guinea data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.