Chad vs Guinea-Bissau: Time required to deal with construction permits
Chad
154 days
in 2012
Guinea-Bissau
163 days
in 2012
Chad rank
28th
Guinea-Bissau rank
27th
Time required to deal with construction permits over time
- Chad
- Guinea-Bissau
How they compare
Guinea-Bissau currently reports 163 days against 154 days in Chad, a difference of 9 days.
That makes Guinea-Bissau's figure about 1.1 times Chad's.
Across all 8 years both countries report, Guinea-Bissau has been ahead every year.
Chad ranks 28th and Guinea-Bissau ranks 27th of 50 countries.
Guinea-Bissau has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Chad | Guinea-Bissau | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 154 days | 163 days | 9 days | Guinea-Bissau |
| 2010s | 154 days | 163 days | 9 days | Guinea-Bissau |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Chad or Guinea-Bissau?
- Guinea-Bissau, at 163 days against 154 days in Chad as of 2012.
- What is the difference in time required to deal with construction permits between Chad and Guinea-Bissau?
- 9 days, with Guinea-Bissau ahead.
- How many years of comparable data are there for Chad and Guinea-Bissau?
- 8 years are reported by both, from 2005 to 2012.
- How do Chad and Guinea-Bissau rank globally for time required to deal with construction permits?
- Chad ranks 28th and Guinea-Bissau ranks 27th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.