Chad vs Rwanda: Time required to deal with construction permits
Chad
154 days
in 2012
Rwanda
164 days
in 2012
Chad rank
28th
Rwanda rank
26th
Time required to deal with construction permits over time
- Chad
- Rwanda
How they compare
Rwanda currently reports 164 days against 154 days in Chad, a difference of 10 days.
That makes Rwanda's figure about 1.1 times Chad's.
Across all 8 years both countries report, Rwanda has been ahead every year.
Chad ranks 28th and Rwanda ranks 26th of 50 countries.
Rwanda has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Chad | Rwanda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 154 days | 256.6 days | 102.6 days | Rwanda |
| 2010s | 154 days | 164 days | 10 days | Rwanda |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Chad or Rwanda?
- Rwanda, at 164 days against 154 days in Chad as of 2012.
- What is the difference in time required to deal with construction permits between Chad and Rwanda?
- 10 days, with Rwanda ahead.
- How many years of comparable data are there for Chad and Rwanda?
- 8 years are reported by both, from 2005 to 2012.
- How do Chad and Rwanda rank globally for time required to deal with construction permits?
- Chad ranks 28th and Rwanda ranks 26th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.