Time required to deal with construction permits (days) in Rwanda

Rwanda: Time required to deal with construction permits (days) was 164 days in 2012. ▼ Falling

Latest (2012)
164 days
Change on year
unchanged
World rank
26th
of 50 countries
All-time high
307 days
in 2005
All-time low
164 days
in 2010
Years of data
8
2005–2012

Time required to deal with construction permits in Rwanda, 2005–2012

01002003002005200820122005: 307 days2006: 307 days2007: 253 days2008: 208 days2009: 208 days2010: 164 days2011: 164 days2012: 164 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Rwanda is 164 days, measured in 2012. That is the lowest value across all 8 years on record.

That represents a change of down 46.6% over ten years.

Rwanda ranks 26th of 50 countries on this measure, in the middle of the range.

Time required to deal with construction permits (days) in Rwanda, year by year

Annual values for Time required to deal with construction permits (days) in Rwanda, 2005 to 2012.
Year days Change
2005 307 days —
2006 307 days +0.0%
2007 253 days -17.6%
2008 208 days -17.8%
2009 208 days +0.0%
2010 164 days -21.2%
2011 164 days +0.0%
2012 164 days +0.0%

Rwanda compared with similar countries

  • Rwanda's 164 days is above the median for low income countries, which is 163.5 days, 1.0× the median. (18 countries reporting)
  • Rwanda's 164 days is above the median for Sub-Saharan Africa, which is 164 days, 1.0× the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 256.6 days 208 days 307 days 5
2010s 164 days 164 days 164 days 3

Countries ranked near Rwanda

  1. 23 Djibouti 172 days compare
  2. 23 Madagascar 172 days compare
  3. 25 Equatorial Guinea 166 days compare
  4. 27 Guinea-Bissau 163 days compare
  5. 28 Chad 154 days compare
  6. 29 Cameroon 147 days compare

See the full ranking of 56 places →

More private sector data for Rwanda

All data for Rwanda →

Frequently asked questions

What is time required to deal with construction permits in Rwanda?
Time required to deal with construction permits in Rwanda was 164 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Rwanda?
The highest recorded value was 307 days in 2005.
What is the lowest time required to deal with construction permits recorded in Rwanda?
The lowest recorded value was 164 days in 2010.
How does Rwanda rank for time required to deal with construction permits?
Rwanda ranks 26th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Rwanda?
Over the last ten years it is down 46.6%. The long-run trend across the full record is falling.
Where does this Rwanda data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Rwanda. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/rwanda/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/rwanda/">Time required to deal with construction permits in Rwanda</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.