Comoros vs Gambia: Time required to deal with construction permits

Comoros
143 days
in 2012
Gambia
143 days
in 2012
Comoros rank
31st
Gambia rank
31st

Time required to deal with construction permits over time

  • Comoros
  • Gambia
050100150200520082012

How they compare

Comoros currently reports 143 days against 143 days in Gambia, a difference of 0 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Comoros ahead.

Comoros ranks 31st and Gambia ranks 31st of 50 countries.

Comoros has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Comoros Gambia Difference Ahead
2000s 143 days 109 days 34 days Comoros
2010s 143 days 143 days 0 days

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Comoros or Gambia?
Comoros, at 143 days against 143 days in Gambia as of 2012.
What is the difference in time required to deal with construction permits between Comoros and Gambia?
0 days, with Comoros ahead.
How many years of comparable data are there for Comoros and Gambia?
8 years are reported by both, from 2005 to 2012.
How do Comoros and Gambia rank globally for time required to deal with construction permits?
Comoros ranks 31st and Gambia ranks 31st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Comoros vs Gambia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 22 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/comoros/gambia-the/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/comoros/gambia-the/">Comoros vs Gambia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.