Comoros vs Namibia: Time required to deal with construction permits
Comoros
143 days
in 2012
Namibia
139 days
in 2012
Comoros rank
31st
Namibia rank
34th
Time required to deal with construction permits over time
- Comoros
- Namibia
How they compare
Comoros currently reports 143 days against 139 days in Namibia, a difference of 4 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Namibia ahead.
Comoros ranks 31st and Namibia ranks 34th of 50 countries.
Across the 2 decades both report, Comoros averaged higher in 1 and Namibia in 1.
Head to head by decade
| Decade | Comoros | Namibia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 143 days | 143.8 days | 0.8 days | Namibia |
| 2010s | 143 days | 139 days | 4 days | Comoros |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Comoros or Namibia?
- Comoros, at 143 days against 139 days in Namibia as of 2012.
- What is the difference in time required to deal with construction permits between Comoros and Namibia?
- 4 days, with Comoros ahead.
- How many years of comparable data are there for Comoros and Namibia?
- 8 years are reported by both, from 2005 to 2012.
- How do Comoros and Namibia rank globally for time required to deal with construction permits?
- Comoros ranks 31st and Namibia ranks 34th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.