Time required to deal with construction permits (days) in Namibia

Namibia: Time required to deal with construction permits (days) was 139 days in 2012. ▼ Falling

Latest (2012)
139 days
Change on year
unchanged
World rank
34th
of 50 countries
All-time high
151 days
in 2005
All-time low
139 days
in 2007
Years of data
8
2005–2012

Time required to deal with construction permits in Namibia, 2005–2012

0501001502005200820122005: 151 days2006: 151 days2007: 139 days2008: 139 days2009: 139 days2010: 139 days2011: 139 days2012: 139 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Namibia recorded 139 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

The figure is down 7.9% over ten years.

That places Namibia 34th out of 50 countries with data for 2012, putting it in the middle of the range.

Time required to deal with construction permits (days) in Namibia, year by year

Annual values for Time required to deal with construction permits (days) in Namibia, 2005 to 2012.
Year days Change
2005 151 days —
2006 151 days +0.0%
2007 139 days -7.9%
2008 139 days +0.0%
2009 139 days +0.0%
2010 139 days +0.0%
2011 139 days +0.0%
2012 139 days +0.0%

Namibia compared with similar countries

  • Namibia's 139 days is below the median for lower middle income countries, which is 196.5 days, 71% of the median. (24 countries reporting)
  • Namibia's 139 days is below the median for Sub-Saharan Africa, which is 164 days, 85% of the median. (45 countries reporting)

Averages by decade

DecadeAverage LowestHighest Years
2000s 143.8 days 139 days 151 days 5
2010s 139 days 139 days 139 days 3

Countries ranked near Namibia

  1. 31 Comoros 143 days compare
  2. 31 Gambia 143 days compare
  3. 31 Mauritius 143 days compare
  4. 35 Ethiopia 128 days compare
  5. 36 South Africa 127 days compare
  6. 37 Seychelles 126 days compare

See the full ranking of 56 places →

More private sector data for Namibia

All data for Namibia →

Frequently asked questions

What is time required to deal with construction permits in Namibia?
Time required to deal with construction permits in Namibia was 139 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Namibia?
The highest recorded value was 151 days in 2005.
What is the lowest time required to deal with construction permits recorded in Namibia?
The lowest recorded value was 139 days in 2007.
How does Namibia rank for time required to deal with construction permits?
Namibia ranks 34th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Namibia?
Over the last ten years it is down 7.9%. The long-run trend across the full record is falling.
Where does this Namibia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Namibia. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 07 November 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/namibia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/namibia/">Time required to deal with construction permits in Namibia</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.