Democratic Republic of Congo vs Morocco: Time required to deal with construction permits

Democratic Republic of Congo
117 days
in 2012
Morocco
97 days
in 2012
Democratic Republic of Congo rank
42nd
Morocco rank
45th

Time required to deal with construction permits over time

  • Democratic Republic of Congo
  • Morocco
0100200300200520082012

How they compare

Democratic Republic of Congo currently reports 117 days against 97 days in Morocco, a difference of 20 days.

That makes Democratic Republic of Congo's figure about 1.2 times Morocco's.

Across all 8 years both countries report, Democratic Republic of Congo has been ahead every year.

Democratic Republic of Congo ranks 42nd and Morocco ranks 45th of 50 countries.

Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Democratic Republic of Congo Morocco Difference Ahead
2000s 250.6 days 108 days 142.6 days Democratic Republic of Congo
2010s 117 days 99.33 days 17.67 days Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Democratic Republic of Congo or Morocco?
Democratic Republic of Congo, at 117 days against 97 days in Morocco as of 2012.
What is the difference in time required to deal with construction permits between Democratic Republic of Congo and Morocco?
20 days, with Democratic Republic of Congo ahead.
How many years of comparable data are there for Democratic Republic of Congo and Morocco?
8 years are reported by both, from 2005 to 2012.
How do Democratic Republic of Congo and Morocco rank globally for time required to deal with construction permits?
Democratic Republic of Congo ranks 42nd and Morocco ranks 45th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.