Congo, Democratic Republic of the vs Sao Tome and Principe: Time required to deal with construction permits
Congo, Democratic Republic of the
117 days
in 2012
Sao Tome and Principe
118 days
in 2012
Congo, Democratic Republic of the rank
42nd
Sao Tome and Principe rank
41st
Time required to deal with construction permits over time
- Congo, Democratic Republic of the
- Sao Tome and Principe
How they compare
Sao Tome and Principe currently reports 118 days against 117 days in Congo, Democratic Republic of the, a difference of 1 days.
Across all 8 years both countries report, Sao Tome and Principe has been ahead every year.
Congo, Democratic Republic of the ranks 42nd and Sao Tome and Principe ranks 41st of 50 countries.
Sao Tome and Principe has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Congo, Democratic Republic of the | Sao Tome and Principe | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 250.6 days | 255 days | 4.4 days | Sao Tome and Principe |
| 2010s | 117 days | 163.67 days | 46.67 days | Sao Tome and Principe |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Congo, Democratic Republic of the or Sao Tome and Principe?
- Sao Tome and Principe, at 118 days against 117 days in Congo, Democratic Republic of the as of 2012.
- What is the difference in time required to deal with construction permits between Congo, Democratic Republic of the and Sao Tome and Principe?
- 1 days, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Congo, Democratic Republic of the and Sao Tome and Principe?
- 8 years are reported by both, from 2005 to 2012.
- How do Congo, Democratic Republic of the and Sao Tome and Principe rank globally for time required to deal with construction permits?
- Congo, Democratic Republic of the ranks 42nd and Sao Tome and Principe ranks 41st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.