Congo, Democratic Republic of the vs Sao Tome and Principe: Time required to deal with construction permits

Congo, Democratic Republic of the
117 days
in 2012
Sao Tome and Principe
118 days
in 2012
Congo, Democratic Republic of the rank
42nd
Sao Tome and Principe rank
41st

Time required to deal with construction permits over time

  • Congo, Democratic Republic of the
  • Sao Tome and Principe
0100200300200520082012

How they compare

Sao Tome and Principe currently reports 118 days against 117 days in Congo, Democratic Republic of the, a difference of 1 days.

Across all 8 years both countries report, Sao Tome and Principe has been ahead every year.

Congo, Democratic Republic of the ranks 42nd and Sao Tome and Principe ranks 41st of 50 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Democratic Republic of the Sao Tome and Principe Difference Ahead
2000s 250.6 days 255 days 4.4 days Sao Tome and Principe
2010s 117 days 163.67 days 46.67 days Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Congo, Democratic Republic of the or Sao Tome and Principe?
Sao Tome and Principe, at 118 days against 117 days in Congo, Democratic Republic of the as of 2012.
What is the difference in time required to deal with construction permits between Congo, Democratic Republic of the and Sao Tome and Principe?
1 days, with Sao Tome and Principe ahead.
How many years of comparable data are there for Congo, Democratic Republic of the and Sao Tome and Principe?
8 years are reported by both, from 2005 to 2012.
How do Congo, Democratic Republic of the and Sao Tome and Principe rank globally for time required to deal with construction permits?
Congo, Democratic Republic of the ranks 42nd and Sao Tome and Principe ranks 41st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Congo, Democratic Republic of the vs Sao Tome and Principe: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 04 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/congo-dem-rep/sao-tome-and-principe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/congo-dem-rep/sao-tome-and-principe/">Congo, Democratic Republic of the vs Sao Tome and Principe: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.