Congo vs Malawi: Time required to deal with construction permits

Congo
201 days
in 2012
Malawi
200 days
in 2012
Congo rank
18th
Malawi rank
19th

Time required to deal with construction permits over time

  • Congo
  • Malawi
050100150200200520082012

How they compare

Congo currently reports 201 days against 200 days in Malawi, a difference of 1 days.

Across all 8 years both countries report, Congo has been ahead every year.

Congo ranks 18th and Malawi ranks 19th of 50 countries.

Congo has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo Malawi Difference Ahead
2000s 201 days 200 days 1 days Congo
2010s 201 days 200 days 1 days Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Congo or Malawi?
Congo, at 201 days against 200 days in Malawi as of 2012.
What is the difference in time required to deal with construction permits between Congo and Malawi?
1 days, with Congo ahead.
How many years of comparable data are there for Congo and Malawi?
8 years are reported by both, from 2005 to 2012.
How do Congo and Malawi rank globally for time required to deal with construction permits?
Congo ranks 18th and Malawi ranks 19th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.