Time required to deal with construction permits in Malawi

Malawi: Time required to deal with construction permits was 200 days in 2012. ▬ Flat

Latest (2012)
200 days
Change on year
unchanged
World rank
19th
of 50 countries
All-time high
200 days
in 2005
All-time low
200 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Malawi, 2005–2012

0501001502002005200820122005: 200 days2006: 200 days2007: 200 days2008: 200 days2009: 200 days2010: 200 days2011: 200 days2012: 200 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Malawi is 200 days, measured in 2012. That is the highest value across all 8 years on record.

The figure is unchanged over ten years.

That places Malawi 19th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 200 days 200 days 200 days 5
2010s 200 days 200 days 200 days 3

Countries ranked near Malawi

  1. 16 Tanzania 206 days compare
  2. 17 Central African Republic 203 days compare
  3. 18 Congo 201 days compare
  4. 20 Guinea 197 days compare
  5. 21 Zambia 196 days compare
  6. 22 Mali 179 days compare

See the full ranking of 56 places →

More private sector data for Malawi

All data for Malawi →

Frequently asked questions

What is time required to deal with construction permits in Malawi?
Time required to deal with construction permits in Malawi was 200 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Malawi?
The highest recorded value was 200 days in 2005.
What is the lowest time required to deal with construction permits recorded in Malawi?
The lowest recorded value was 200 days in 2005.
How does Malawi rank for time required to deal with construction permits?
Malawi ranks 19th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Malawi?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Malawi data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.