Time required to deal with construction permits in Congo
Congo: Time required to deal with construction permits was 201 days in 2012. ▬ Flat
Time required to deal with construction permits in Congo, 2005–2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
Congo recorded 201 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.
That represents a change of unchanged over ten years.
That places Congo 18th out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 201 days | 201 days | 201 days | 5 |
| 2010s | 201 days | 201 days | 201 days | 3 |
Countries ranked near Congo
More private sector data for Congo
- Merchandise trade 94.4% (2025)
- Food imports 21.2% (2023)
- Manufactures imports 71.4% (2023)
- Merchandise imports 7.90 billion current US$ (2025)
- Food exports 0.2% (2023)
- Manufactures exports 10.3% (2023)
- Merchandise exports 7.50 billion current US$ (2025)
- Commercial service exports 225.02 million current US$ (2021)
- Transport services 33.8% (2021)
- Computer, communications and other services 61.4% (2021)
Frequently asked questions
- What is time required to deal with construction permits in Congo?
- Time required to deal with construction permits in Congo was 201 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Congo?
- The highest recorded value was 201 days in 2005.
- What is the lowest time required to deal with construction permits recorded in Congo?
- The lowest recorded value was 201 days in 2005.
- How does Congo rank for time required to deal with construction permits?
- Congo ranks 18th out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Congo?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Congo data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.