Time required to deal with construction permits in Congo

Congo: Time required to deal with construction permits was 201 days in 2012. ▬ Flat

Latest (2012)
201 days
Change on year
unchanged
World rank
18th
of 50 countries
All-time high
201 days
in 2005
All-time low
201 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Congo, 2005–2012

0501001502002005200820122005: 201 days2006: 201 days2007: 201 days2008: 201 days2009: 201 days2010: 201 days2011: 201 days2012: 201 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Congo recorded 201 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.

That represents a change of unchanged over ten years.

That places Congo 18th out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 201 days 201 days 201 days 5
2010s 201 days 201 days 201 days 3

Countries ranked near Congo

  1. 15 Senegal 210 days compare
  2. 16 Tanzania 206 days compare
  3. 17 Central African Republic 203 days compare
  4. 19 Malawi 200 days compare
  5. 20 Guinea 197 days compare
  6. 21 Zambia 196 days compare

See the full ranking of 56 places →

More private sector data for Congo

All data for Congo →

Frequently asked questions

What is time required to deal with construction permits in Congo?
Time required to deal with construction permits in Congo was 201 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Congo?
The highest recorded value was 201 days in 2005.
What is the lowest time required to deal with construction permits recorded in Congo?
The lowest recorded value was 201 days in 2005.
How does Congo rank for time required to deal with construction permits?
Congo ranks 18th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Congo?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Congo data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.