Congo vs Zambia: Time required to deal with construction permits
Congo
201 days
in 2012
Zambia
196 days
in 2012
Congo rank
18th
Zambia rank
21st
Time required to deal with construction permits over time
- Congo
- Zambia
How they compare
Congo currently reports 201 days against 196 days in Zambia, a difference of 5 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Zambia ahead.
Congo ranks 18th and Zambia ranks 21st of 50 countries.
Across the 2 decades both report, Congo averaged higher in 1 and Zambia in 1.
Head to head by decade
| Decade | Congo | Zambia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 201 days | 207.6 days | 6.6 days | Zambia |
| 2010s | 201 days | 196 days | 5 days | Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Congo or Zambia?
- Congo, at 201 days against 196 days in Zambia as of 2012.
- What is the difference in time required to deal with construction permits between Congo and Zambia?
- 5 days, with Congo ahead.
- How many years of comparable data are there for Congo and Zambia?
- 8 years are reported by both, from 2005 to 2012.
- How do Congo and Zambia rank globally for time required to deal with construction permits?
- Congo ranks 18th and Zambia ranks 21st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.