Time required to deal with construction permits in Zambia

Zambia: Time required to deal with construction permits was 196 days in 2012. ▼ Falling

Latest (2012)
196 days
Change on year
unchanged
World rank
21st
of 50 countries
All-time high
225 days
in 2005
All-time low
196 days
in 2007
Years of data
8
2005–2012

Time required to deal with construction permits in Zambia, 2005–2012

0501001502002502005200820122005: 225 days2006: 225 days2007: 196 days2008: 196 days2009: 196 days2010: 196 days2011: 196 days2012: 196 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Zambia recorded 196 days for time required to deal with construction permits in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 12.9% over ten years.

Zambia ranks 21st of 50 countries on this measure, in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 207.6 days 196 days 225 days 5
2010s 196 days 196 days 196 days 3

Countries ranked near Zambia

  1. 18 Congo 201 days compare
  2. 19 Malawi 200 days compare
  3. 20 Guinea 197 days compare
  4. 22 Mali 179 days compare
  5. 23 Djibouti 172 days compare
  6. 23 Madagascar 172 days compare

See the full ranking of 56 places →

More private sector data for Zambia

All data for Zambia →

Frequently asked questions

What is time required to deal with construction permits in Zambia?
Time required to deal with construction permits in Zambia was 196 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Zambia?
The highest recorded value was 225 days in 2005.
What is the lowest time required to deal with construction permits recorded in Zambia?
The lowest recorded value was 196 days in 2007.
How does Zambia rank for time required to deal with construction permits?
Zambia ranks 21st out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Zambia?
Over the last ten years it is down 12.9%. The long-run trend across the full record is falling.
Where does this Zambia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.