Côte d'Ivoire vs Lesotho: Time required to deal with construction permits

Côte d'Ivoire
475 days
in 2012
Lesotho
330 days
in 2012
Côte d'Ivoire rank
2nd
Lesotho rank
5th

Time required to deal with construction permits over time

  • Côte d'Ivoire
  • Lesotho
0200400600200520082012

How they compare

Côte d'Ivoire currently reports 475 days against 330 days in Lesotho, a difference of 145 days.

That makes Côte d'Ivoire's figure about 1.4 times Lesotho's.

Across all 8 years both countries report, Côte d'Ivoire has been ahead every year.

Côte d'Ivoire ranks 2nd and Lesotho ranks 5th of 50 countries.

Côte d'Ivoire has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Côte d'Ivoire Lesotho Difference Ahead
2000s 534.2 days 401.2 days 133 days Côte d'Ivoire
2010s 475 days 330 days 145 days Côte d'Ivoire

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Côte d'Ivoire or Lesotho?
Côte d'Ivoire, at 475 days against 330 days in Lesotho as of 2012.
What is the difference in time required to deal with construction permits between Côte d'Ivoire and Lesotho?
145 days, with Côte d'Ivoire ahead.
How many years of comparable data are there for Côte d'Ivoire and Lesotho?
8 years are reported by both, from 2005 to 2012.
How do Côte d'Ivoire and Lesotho rank globally for time required to deal with construction permits?
Côte d'Ivoire ranks 2nd and Lesotho ranks 5th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Côte d'Ivoire vs Lesotho: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/lesotho/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/lesotho/">Côte d'Ivoire vs Lesotho: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.