Cote d'Ivoire vs Mozambique: Time required to deal with construction permits

Cote d'Ivoire
475 days
in 2012
Mozambique
377 days
in 2012
Cote d'Ivoire rank
2nd
Mozambique rank
3rd

Time required to deal with construction permits over time

  • Cote d'Ivoire
  • Mozambique
0200400600200520082012

How they compare

Cote d'Ivoire currently reports 475 days against 377 days in Mozambique, a difference of 98 days.

That makes Cote d'Ivoire's figure about 1.3 times Mozambique's.

Across all 8 years both countries report, Cote d'Ivoire has been ahead every year.

Cote d'Ivoire ranks 2nd and Mozambique ranks 3rd of 50 countries.

Cote d'Ivoire has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cote d'Ivoire Mozambique Difference Ahead
2000s 534.2 days 377 days 157.2 days Cote d'Ivoire
2010s 475 days 377 days 98 days Cote d'Ivoire

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cote d'Ivoire or Mozambique?
Cote d'Ivoire, at 475 days against 377 days in Mozambique as of 2012.
What is the difference in time required to deal with construction permits between Cote d'Ivoire and Mozambique?
98 days, with Cote d'Ivoire ahead.
How many years of comparable data are there for Cote d'Ivoire and Mozambique?
8 years are reported by both, from 2005 to 2012.
How do Cote d'Ivoire and Mozambique rank globally for time required to deal with construction permits?
Cote d'Ivoire ranks 2nd and Mozambique ranks 3rd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cote d'Ivoire vs Mozambique: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 01 September 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/mozambique/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/mozambique/">Cote d'Ivoire vs Mozambique: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.