Cote d'Ivoire vs Zimbabwe: Time required to deal with construction permits

Cote d'Ivoire
475 days
in 2012
Zimbabwe
614 days
in 2012
Cote d'Ivoire rank
2nd
Zimbabwe rank
1st

Time required to deal with construction permits over time

  • Cote d'Ivoire
  • Zimbabwe
0200400600200520082012

How they compare

Zimbabwe currently reports 614 days against 475 days in Cote d'Ivoire, a difference of 139 days.

That makes Zimbabwe's figure about 1.3 times Cote d'Ivoire's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Cote d'Ivoire ahead.

Cote d'Ivoire ranks 2nd and Zimbabwe ranks 1st of 50 countries.

Across the 2 decades both report, Cote d'Ivoire averaged higher in 1 and Zimbabwe in 1.

Head to head by decade

Decade Cote d'Ivoire Zimbabwe Difference Ahead
2000s 534.2 days 482.8 days 51.4 days Cote d'Ivoire
2010s 475 days 614 days 139 days Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Cote d'Ivoire or Zimbabwe?
Zimbabwe, at 614 days against 475 days in Cote d'Ivoire as of 2012.
What is the difference in time required to deal with construction permits between Cote d'Ivoire and Zimbabwe?
139 days, with Zimbabwe ahead.
How many years of comparable data are there for Cote d'Ivoire and Zimbabwe?
8 years are reported by both, from 2005 to 2012.
How do Cote d'Ivoire and Zimbabwe rank globally for time required to deal with construction permits?
Cote d'Ivoire ranks 2nd and Zimbabwe ranks 1st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Cote d'Ivoire vs Zimbabwe: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 28 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/zimbabwe/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/cote-d-ivoire/zimbabwe/">Cote d'Ivoire vs Zimbabwe: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.