Djibouti vs Equatorial Guinea: Time required to deal with construction permits
Djibouti
172 days
in 2012
Equatorial Guinea
166 days
in 2012
Djibouti rank
23rd
Equatorial Guinea rank
25th
Time required to deal with construction permits over time
- Djibouti
- Equatorial Guinea
How they compare
Djibouti currently reports 172 days against 166 days in Equatorial Guinea, a difference of 6 days.
Across all 8 years both countries report, Djibouti has been ahead every year.
Djibouti ranks 23rd and Equatorial Guinea ranks 25th of 50 countries.
Djibouti has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Djibouti | Equatorial Guinea | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 171 days | 166 days | 5 days | Djibouti |
| 2010s | 171.67 days | 166 days | 5.67 days | Djibouti |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Djibouti or Equatorial Guinea?
- Djibouti, at 172 days against 166 days in Equatorial Guinea as of 2012.
- What is the difference in time required to deal with construction permits between Djibouti and Equatorial Guinea?
- 6 days, with Djibouti ahead.
- How many years of comparable data are there for Djibouti and Equatorial Guinea?
- 8 years are reported by both, from 2005 to 2012.
- How do Djibouti and Equatorial Guinea rank globally for time required to deal with construction permits?
- Djibouti ranks 23rd and Equatorial Guinea ranks 25th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.