Time required to deal with construction permits in Djibouti

Djibouti: Time required to deal with construction permits was 172 days in 2012. β–¬ Flat

Latest (2012)
172 days
Change on year
unchanged
World rank
23rd
of 50 countries
All-time high
172 days
in 2011
All-time low
171 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Djibouti, 2005–2012

0501001502005200820122005: 171 days2006: 171 days2007: 171 days2008: 171 days2009: 171 days2010: 171 days2011: 172 days2012: 172 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

Djibouti recorded 172 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.

Compared with earlier readings it is up 0.6% over ten years.

That places Djibouti 23rd out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 171 days 171 days 171 days 5
2010s 171.67 days 171 days 172 days 3

Countries ranked near Djibouti

  1. 20 Guinea 197 days compare
  2. 21 Zambia 196 days compare
  3. 22 Mali 179 days compare
  4. 23 Madagascar 172 days compare
  5. 25 Equatorial Guinea 166 days compare
  6. 26 Rwanda 164 days compare

See the full ranking of 56 places β†’

More private sector data for Djibouti

All data for Djibouti β†’

Frequently asked questions

What is time required to deal with construction permits in Djibouti?
Time required to deal with construction permits in Djibouti was 172 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Djibouti?
The highest recorded value was 172 days in 2011.
What is the lowest time required to deal with construction permits recorded in Djibouti?
The lowest recorded value was 171 days in 2005.
How does Djibouti rank for time required to deal with construction permits?
Djibouti ranks 23rd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Djibouti?
Over the last ten years it is up 0.6%. The long-run trend across the full record is flat.
Where does this Djibouti data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Time required to deal with construction permits in Djibouti. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 19 August 2026, from https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/djibouti/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/time-required-to-deal-with-construction-permits-days/djibouti/">Time required to deal with construction permits in Djibouti</a> β€” Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.