Time required to deal with construction permits in Djibouti
Djibouti: Time required to deal with construction permits was 172 days in 2012. β¬ Flat
Time required to deal with construction permits in Djibouti, 2005β2012
Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.
Analysis
Djibouti recorded 172 days for time required to deal with construction permits in 2012. That is the highest value across all 8 years on record.
Compared with earlier readings it is up 0.6% over ten years.
That places Djibouti 23rd out of 50 countries with data for 2012, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2000s | 171 days | 171 days | 171 days | 5 |
| 2010s | 171.67 days | 171 days | 172 days | 3 |
Countries ranked near Djibouti
More private sector data for Djibouti
- Merchandise trade 267.1% (2025)
- Food imports 38.6% (2023)
- Manufactures imports 51.9% (2023)
- Merchandise imports 6.26 billion current US$ (2025)
- Food exports 41.5% (2023)
- Manufactures exports 56.6% (2023)
- Merchandise exports 6.09 billion current US$ (2025)
- Merchandise exports (current US$), per capita 5,143 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 1.32 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 17.82 % change on previous year (2025)
Frequently asked questions
- What is time required to deal with construction permits in Djibouti?
- Time required to deal with construction permits in Djibouti was 172 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
- What is the highest time required to deal with construction permits recorded in Djibouti?
- The highest recorded value was 172 days in 2011.
- What is the lowest time required to deal with construction permits recorded in Djibouti?
- The lowest recorded value was 171 days in 2005.
- How does Djibouti rank for time required to deal with construction permits?
- Djibouti ranks 23rd out of 50 countries with data for 2012.
- Is time required to deal with construction permits rising or falling in Djibouti?
- Over the last ten years it is up 0.6%. The long-run trend across the full record is flat.
- Where does this Djibouti data come from?
- The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.
Download this data
CSV Β· JSON β 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.