Djibouti vs Guinea: Time required to deal with construction permits
Djibouti
172 days
in 2012
Guinea
197 days
in 2012
Djibouti rank
23rd
Guinea rank
20th
Time required to deal with construction permits over time
- Djibouti
- Guinea
How they compare
Guinea currently reports 197 days against 172 days in Djibouti, a difference of 25 days.
That makes Guinea's figure about 1.1 times Djibouti's.
Across all 8 years both countries report, Guinea has been ahead every year.
Djibouti ranks 23rd and Guinea ranks 20th of 50 countries.
Guinea has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Djibouti | Guinea | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 171 days | 197 days | 26 days | Guinea |
| 2010s | 171.67 days | 197 days | 25.33 days | Guinea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Djibouti or Guinea?
- Guinea, at 197 days against 172 days in Djibouti as of 2012.
- What is the difference in time required to deal with construction permits between Djibouti and Guinea?
- 25 days, with Guinea ahead.
- How many years of comparable data are there for Djibouti and Guinea?
- 8 years are reported by both, from 2005 to 2012.
- How do Djibouti and Guinea rank globally for time required to deal with construction permits?
- Djibouti ranks 23rd and Guinea ranks 20th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.