Djibouti vs Rwanda: Time required to deal with construction permits
Djibouti
172 days
in 2012
Rwanda
164 days
in 2012
Djibouti rank
23rd
Rwanda rank
26th
Time required to deal with construction permits over time
- Djibouti
- Rwanda
How they compare
Djibouti currently reports 172 days against 164 days in Rwanda, a difference of 8 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Rwanda ahead.
Djibouti ranks 23rd and Rwanda ranks 26th of 50 countries.
Across the 2 decades both report, Djibouti averaged higher in 1 and Rwanda in 1.
Head to head by decade
| Decade | Djibouti | Rwanda | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 171 days | 256.6 days | 85.6 days | Rwanda |
| 2010s | 171.67 days | 164 days | 7.67 days | Djibouti |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Djibouti or Rwanda?
- Djibouti, at 172 days against 164 days in Rwanda as of 2012.
- What is the difference in time required to deal with construction permits between Djibouti and Rwanda?
- 8 days, with Djibouti ahead.
- How many years of comparable data are there for Djibouti and Rwanda?
- 8 years are reported by both, from 2005 to 2012.
- How do Djibouti and Rwanda rank globally for time required to deal with construction permits?
- Djibouti ranks 23rd and Rwanda ranks 26th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.