Djibouti vs Zambia: Time required to deal with construction permits

Djibouti
172 days
in 2012
Zambia
196 days
in 2012
Djibouti rank
23rd
Zambia rank
21st

Time required to deal with construction permits over time

  • Djibouti
  • Zambia
050100150200250200520082012

How they compare

Zambia currently reports 196 days against 172 days in Djibouti, a difference of 24 days.

That makes Zambia's figure about 1.1 times Djibouti's.

Across all 8 years both countries report, Zambia has been ahead every year.

Djibouti ranks 23rd and Zambia ranks 21st of 50 countries.

Zambia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Djibouti Zambia Difference Ahead
2000s 171 days 207.6 days 36.6 days Zambia
2010s 171.67 days 196 days 24.33 days Zambia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Djibouti or Zambia?
Zambia, at 196 days against 172 days in Djibouti as of 2012.
What is the difference in time required to deal with construction permits between Djibouti and Zambia?
24 days, with Zambia ahead.
How many years of comparable data are there for Djibouti and Zambia?
8 years are reported by both, from 2005 to 2012.
How do Djibouti and Zambia rank globally for time required to deal with construction permits?
Djibouti ranks 23rd and Zambia ranks 21st of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Djibouti vs Zambia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/djibouti/zambia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/djibouti/zambia/">Djibouti vs Zambia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.