Djibouti vs Zambia: Time required to deal with construction permits
Djibouti
172 days
in 2012
Zambia
196 days
in 2012
Djibouti rank
23rd
Zambia rank
21st
Time required to deal with construction permits over time
- Djibouti
- Zambia
How they compare
Zambia currently reports 196 days against 172 days in Djibouti, a difference of 24 days.
That makes Zambia's figure about 1.1 times Djibouti's.
Across all 8 years both countries report, Zambia has been ahead every year.
Djibouti ranks 23rd and Zambia ranks 21st of 50 countries.
Zambia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Djibouti | Zambia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 171 days | 207.6 days | 36.6 days | Zambia |
| 2010s | 171.67 days | 196 days | 24.33 days | Zambia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Djibouti or Zambia?
- Zambia, at 196 days against 172 days in Djibouti as of 2012.
- What is the difference in time required to deal with construction permits between Djibouti and Zambia?
- 24 days, with Zambia ahead.
- How many years of comparable data are there for Djibouti and Zambia?
- 8 years are reported by both, from 2005 to 2012.
- How do Djibouti and Zambia rank globally for time required to deal with construction permits?
- Djibouti ranks 23rd and Zambia ranks 21st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.