Equatorial Guinea vs Guinea-Bissau: Time required to deal with construction permits
Equatorial Guinea
166 days
in 2012
Guinea-Bissau
163 days
in 2012
Equatorial Guinea rank
25th
Guinea-Bissau rank
27th
Time required to deal with construction permits over time
- Equatorial Guinea
- Guinea-Bissau
How they compare
Equatorial Guinea currently reports 166 days against 163 days in Guinea-Bissau, a difference of 3 days.
Across all 8 years both countries report, Equatorial Guinea has been ahead every year.
Equatorial Guinea ranks 25th and Guinea-Bissau ranks 27th of 50 countries.
Equatorial Guinea has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Equatorial Guinea | Guinea-Bissau | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 166 days | 163 days | 3 days | Equatorial Guinea |
| 2010s | 166 days | 163 days | 3 days | Equatorial Guinea |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Equatorial Guinea or Guinea-Bissau?
- Equatorial Guinea, at 166 days against 163 days in Guinea-Bissau as of 2012.
- What is the difference in time required to deal with construction permits between Equatorial Guinea and Guinea-Bissau?
- 3 days, with Equatorial Guinea ahead.
- How many years of comparable data are there for Equatorial Guinea and Guinea-Bissau?
- 8 years are reported by both, from 2005 to 2012.
- How do Equatorial Guinea and Guinea-Bissau rank globally for time required to deal with construction permits?
- Equatorial Guinea ranks 25th and Guinea-Bissau ranks 27th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.