Equatorial Guinea vs Madagascar: Time required to deal with construction permits

Equatorial Guinea
166 days
in 2012
Madagascar
172 days
in 2012
Equatorial Guinea rank
25th
Madagascar rank
23rd

Time required to deal with construction permits over time

  • Equatorial Guinea
  • Madagascar
0100200300200520082012

How they compare

Madagascar currently reports 172 days against 166 days in Equatorial Guinea, a difference of 6 days.

Across all 8 years both countries report, Madagascar has been ahead every year.

Equatorial Guinea ranks 25th and Madagascar ranks 23rd of 50 countries.

Madagascar has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Equatorial Guinea Madagascar Difference Ahead
2000s 166 days 242.2 days 76.2 days Madagascar
2010s 166 days 172 days 6 days Madagascar

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Equatorial Guinea or Madagascar?
Madagascar, at 172 days against 166 days in Equatorial Guinea as of 2012.
What is the difference in time required to deal with construction permits between Equatorial Guinea and Madagascar?
6 days, with Madagascar ahead.
How many years of comparable data are there for Equatorial Guinea and Madagascar?
8 years are reported by both, from 2005 to 2012.
How do Equatorial Guinea and Madagascar rank globally for time required to deal with construction permits?
Equatorial Guinea ranks 25th and Madagascar ranks 23rd of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Equatorial Guinea vs Madagascar: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/equatorial-guinea/madagascar/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/equatorial-guinea/madagascar/">Equatorial Guinea vs Madagascar: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.