Time required to deal with construction permits in Madagascar

Madagascar: Time required to deal with construction permits was 172 days in 2012. ▼ Falling

Latest (2012)
172 days
Change on year
unchanged
World rank
23rd
of 50 countries
All-time high
289 days
in 2005
All-time low
172 days
in 2008
Years of data
8
2005–2012

Time required to deal with construction permits in Madagascar, 2005–2012

01002003002005200820122005: 289 days2006: 289 days2007: 289 days2008: 172 days2009: 172 days2010: 172 days2011: 172 days2012: 172 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

The most recent figure for time required to deal with construction permits in Madagascar is 172 days, measured in 2012. That is the lowest value across all 8 years on record.

Compared with earlier readings it is down 40.5% over ten years.

That places Madagascar 23rd out of 50 countries with data for 2012, putting it in the middle of the range.

Averages by decade

DecadeAverage LowestHighest Years
2000s 242.2 days 172 days 289 days 5
2010s 172 days 172 days 172 days 3

Countries ranked near Madagascar

  1. 20 Guinea 197 days compare
  2. 21 Zambia 196 days compare
  3. 22 Mali 179 days compare
  4. 25 Equatorial Guinea 166 days compare
  5. 26 Rwanda 164 days compare

See the full ranking of 56 places →

More private sector data for Madagascar

All data for Madagascar →

Frequently asked questions

What is time required to deal with construction permits in Madagascar?
Time required to deal with construction permits in Madagascar was 172 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Madagascar?
The highest recorded value was 289 days in 2005.
What is the lowest time required to deal with construction permits recorded in Madagascar?
The lowest recorded value was 172 days in 2008.
How does Madagascar rank for time required to deal with construction permits?
Madagascar ranks 23rd out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Madagascar?
Over the last ten years it is down 40.5%. The long-run trend across the full record is falling.
Where does this Madagascar data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.