Equatorial Guinea vs Rwanda: Time required to deal with construction permits

Equatorial Guinea
166 days
in 2012
Rwanda
164 days
in 2012
Equatorial Guinea rank
25th
Rwanda rank
26th

Time required to deal with construction permits over time

  • Equatorial Guinea
  • Rwanda
0100200300200520082012

How they compare

Equatorial Guinea currently reports 166 days against 164 days in Rwanda, a difference of 2 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Rwanda ahead.

Equatorial Guinea ranks 25th and Rwanda ranks 26th of 50 countries.

Across the 2 decades both report, Equatorial Guinea averaged higher in 1 and Rwanda in 1.

Head to head by decade

Decade Equatorial Guinea Rwanda Difference Ahead
2000s 166 days 256.6 days 90.6 days Rwanda
2010s 166 days 164 days 2 days Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Equatorial Guinea or Rwanda?
Equatorial Guinea, at 166 days against 164 days in Rwanda as of 2012.
What is the difference in time required to deal with construction permits between Equatorial Guinea and Rwanda?
2 days, with Equatorial Guinea ahead.
How many years of comparable data are there for Equatorial Guinea and Rwanda?
8 years are reported by both, from 2005 to 2012.
How do Equatorial Guinea and Rwanda rank globally for time required to deal with construction permits?
Equatorial Guinea ranks 25th and Rwanda ranks 26th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.