Eswatini vs Mauritania: Time required to deal with construction permits

Eswatini
95 days
in 2012
Mauritania
82 days
in 2012
Eswatini rank
46th
Mauritania rank
49th

Time required to deal with construction permits over time

  • Eswatini
  • Mauritania
050100150200520082012

How they compare

Eswatini currently reports 95 days against 82 days in Mauritania, a difference of 13 days.

That makes Eswatini's figure about 1.2 times Mauritania's.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Mauritania ahead.

Eswatini ranks 46th and Mauritania ranks 49th of 50 countries.

Mauritania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Eswatini Mauritania Difference Ahead
2000s 95 days 162 days 67 days Mauritania
2010s 95 days 98.33 days 3.33 days Mauritania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Eswatini or Mauritania?
Eswatini, at 95 days against 82 days in Mauritania as of 2012.
What is the difference in time required to deal with construction permits between Eswatini and Mauritania?
13 days, with Eswatini ahead.
How many years of comparable data are there for Eswatini and Mauritania?
8 years are reported by both, from 2005 to 2012.
How do Eswatini and Mauritania rank globally for time required to deal with construction permits?
Eswatini ranks 46th and Mauritania ranks 49th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Eswatini vs Mauritania: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/eswatini/mauritania/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/eswatini/mauritania/">Eswatini vs Mauritania: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.