Time required to deal with construction permits in Mauritania

Mauritania: Time required to deal with construction permits was 82 days in 2012. ▼ Falling

Latest (2012)
82 days
Change on year
unchanged
World rank
49th
of 50 countries
All-time high
162 days
in 2005
All-time low
82 days
in 2011
Years of data
8
2005–2012

Time required to deal with construction permits in Mauritania, 2005–2012

0501001502005200820122005: 162 days2006: 162 days2007: 162 days2008: 162 days2009: 162 days2010: 131 days2011: 82 days2012: 82 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Mauritania stood at 82 days. That is the lowest value across all 8 years on record.

The figure is down 49.4% over ten years.

Mauritania ranks 49th of 50 countries on this measure, in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 162 days 162 days 162 days 5
2010s 98.33 days 82 days 131 days 3

Countries ranked near Mauritania

  1. 46 Eswatini 95 days compare
  2. 47 Tunisia 88 days compare
  3. 48 Nigeria 85 days compare
  4. 50 Liberia 75 days compare

See the full ranking of 56 places →

More private sector data for Mauritania

All data for Mauritania →

Frequently asked questions

What is time required to deal with construction permits in Mauritania?
Time required to deal with construction permits in Mauritania was 82 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Mauritania?
The highest recorded value was 162 days in 2005.
What is the lowest time required to deal with construction permits recorded in Mauritania?
The lowest recorded value was 82 days in 2011.
How does Mauritania rank for time required to deal with construction permits?
Mauritania ranks 49th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Mauritania?
Over the last ten years it is down 49.4%. The long-run trend across the full record is falling.
Where does this Mauritania data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.