Eswatini vs Tunisia: Time required to deal with construction permits

Eswatini
95 days
in 2012
Tunisia
88 days
in 2012
Eswatini rank
46th
Tunisia rank
47th

Time required to deal with construction permits over time

  • Eswatini
  • Tunisia
020406080100200520082012

How they compare

Eswatini currently reports 95 days against 88 days in Tunisia, a difference of 7 days.

That makes Eswatini's figure about 1.1 times Tunisia's.

Across all 8 years both countries report, Eswatini has been ahead every year.

Eswatini ranks 46th and Tunisia ranks 47th of 50 countries.

Eswatini has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Eswatini Tunisia Difference Ahead
2000s 95 days 86.4 days 8.6 days Eswatini
2010s 95 days 88 days 7 days Eswatini

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Eswatini or Tunisia?
Eswatini, at 95 days against 88 days in Tunisia as of 2012.
What is the difference in time required to deal with construction permits between Eswatini and Tunisia?
7 days, with Eswatini ahead.
How many years of comparable data are there for Eswatini and Tunisia?
8 years are reported by both, from 2005 to 2012.
How do Eswatini and Tunisia rank globally for time required to deal with construction permits?
Eswatini ranks 46th and Tunisia ranks 47th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Eswatini vs Tunisia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/eswatini/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/eswatini/tunisia/">Eswatini vs Tunisia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.