Eswatini vs Tunisia: Time required to deal with construction permits
Eswatini
95 days
in 2012
Tunisia
88 days
in 2012
Eswatini rank
46th
Tunisia rank
47th
Time required to deal with construction permits over time
- Eswatini
- Tunisia
How they compare
Eswatini currently reports 95 days against 88 days in Tunisia, a difference of 7 days.
That makes Eswatini's figure about 1.1 times Tunisia's.
Across all 8 years both countries report, Eswatini has been ahead every year.
Eswatini ranks 46th and Tunisia ranks 47th of 50 countries.
Eswatini has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Eswatini | Tunisia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 95 days | 86.4 days | 8.6 days | Eswatini |
| 2010s | 95 days | 88 days | 7 days | Eswatini |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Eswatini or Tunisia?
- Eswatini, at 95 days against 88 days in Tunisia as of 2012.
- What is the difference in time required to deal with construction permits between Eswatini and Tunisia?
- 7 days, with Eswatini ahead.
- How many years of comparable data are there for Eswatini and Tunisia?
- 8 years are reported by both, from 2005 to 2012.
- How do Eswatini and Tunisia rank globally for time required to deal with construction permits?
- Eswatini ranks 46th and Tunisia ranks 47th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.