Time required to deal with construction permits in Tunisia

Tunisia: Time required to deal with construction permits was 88 days in 2012. ▬ Flat

Latest (2012)
88 days
Change on year
unchanged
World rank
47th
of 50 countries
All-time high
90 days
in 2005
All-time low
81 days
in 2008
Years of data
8
2005–2012

Time required to deal with construction permits in Tunisia, 2005–2012

0204060801002005200820122005: 90 days2006: 90 days2007: 90 days2008: 81 days2009: 81 days2010: 88 days2011: 88 days2012: 88 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Tunisia stood at 88 days.

Compared with earlier readings it is down 2.2% over ten years.

Tunisia ranks 47th of 50 countries on this measure, in the bottom quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 86.4 days 81 days 90 days 5
2010s 88 days 88 days 88 days 3

Countries ranked near Tunisia

  1. 44 Burkina Faso 98 days compare
  2. 45 Morocco 97 days compare
  3. 46 Eswatini 95 days compare
  4. 48 Nigeria 85 days compare
  5. 49 Mauritania 82 days compare
  6. 50 Liberia 75 days compare

See the full ranking of 56 places →

More private sector data for Tunisia

All data for Tunisia →

Frequently asked questions

What is time required to deal with construction permits in Tunisia?
Time required to deal with construction permits in Tunisia was 88 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Tunisia?
The highest recorded value was 90 days in 2005.
What is the lowest time required to deal with construction permits recorded in Tunisia?
The lowest recorded value was 81 days in 2008.
How does Tunisia rank for time required to deal with construction permits?
Tunisia ranks 47th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Tunisia?
Over the last ten years it is down 2.2%. The long-run trend across the full record is flat.
Where does this Tunisia data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.