Ethiopia, The Federal Democratic Republic of vs Kenya: Time required to deal with construction permits
Ethiopia, The Federal Democratic Republic of
128 days
in 2012
Kenya
125 days
in 2012
Ethiopia, The Federal Democratic Republic of rank
35th
Kenya rank
38th
Time required to deal with construction permits over time
- Ethiopia, The Federal Democratic Republic of
- Kenya
How they compare
Ethiopia, The Federal Democratic Republic of currently reports 128 days against 125 days in Kenya, a difference of 3 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Kenya ahead.
Ethiopia, The Federal Democratic Republic of ranks 35th and Kenya ranks 38th of 50 countries.
Across the 2 decades both report, Ethiopia, The Federal Democratic Republic of averaged higher in 1 and Kenya in 1.
Head to head by decade
| Decade | Ethiopia, The Federal Democratic Republic of | Kenya | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 128 days | 137.2 days | 9.2 days | Kenya |
| 2010s | 128 days | 125 days | 3 days | Ethiopia, The Federal Democratic Republic of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ethiopia, The Federal Democratic Republic of or Kenya?
- Ethiopia, The Federal Democratic Republic of, at 128 days against 125 days in Kenya as of 2012.
- What is the difference in time required to deal with construction permits between Ethiopia, The Federal Democratic Republic of and Kenya?
- 3 days, with Ethiopia, The Federal Democratic Republic of ahead.
- How many years of comparable data are there for Ethiopia, The Federal Democratic Republic of and Kenya?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia, The Federal Democratic Republic of and Kenya rank globally for time required to deal with construction permits?
- Ethiopia, The Federal Democratic Republic of ranks 35th and Kenya ranks 38th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.