Ethiopia vs Namibia: Time required to deal with construction permits
Ethiopia
128 days
in 2012
Namibia
139 days
in 2012
Ethiopia rank
35th
Namibia rank
34th
Time required to deal with construction permits over time
- Ethiopia
- Namibia
How they compare
Namibia currently reports 139 days against 128 days in Ethiopia, a difference of 11 days.
That makes Namibia's figure about 1.1 times Ethiopia's.
Across all 8 years both countries report, Namibia has been ahead every year.
Ethiopia ranks 35th and Namibia ranks 34th of 50 countries.
Namibia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ethiopia | Namibia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 128 days | 143.8 days | 15.8 days | Namibia |
| 2010s | 128 days | 139 days | 11 days | Namibia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ethiopia or Namibia?
- Namibia, at 139 days against 128 days in Ethiopia as of 2012.
- What is the difference in time required to deal with construction permits between Ethiopia and Namibia?
- 11 days, with Namibia ahead.
- How many years of comparable data are there for Ethiopia and Namibia?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia and Namibia rank globally for time required to deal with construction permits?
- Ethiopia ranks 35th and Namibia ranks 34th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.