Ethiopia vs Namibia: Time required to deal with construction permits

Ethiopia
128 days
in 2012
Namibia
139 days
in 2012
Ethiopia rank
35th
Namibia rank
34th

Time required to deal with construction permits over time

  • Ethiopia
  • Namibia
050100150200520082012

How they compare

Namibia currently reports 139 days against 128 days in Ethiopia, a difference of 11 days.

That makes Namibia's figure about 1.1 times Ethiopia's.

Across all 8 years both countries report, Namibia has been ahead every year.

Ethiopia ranks 35th and Namibia ranks 34th of 50 countries.

Namibia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ethiopia Namibia Difference Ahead
2000s 128 days 143.8 days 15.8 days Namibia
2010s 128 days 139 days 11 days Namibia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Ethiopia or Namibia?
Namibia, at 139 days against 128 days in Ethiopia as of 2012.
What is the difference in time required to deal with construction permits between Ethiopia and Namibia?
11 days, with Namibia ahead.
How many years of comparable data are there for Ethiopia and Namibia?
8 years are reported by both, from 2005 to 2012.
How do Ethiopia and Namibia rank globally for time required to deal with construction permits?
Ethiopia ranks 35th and Namibia ranks 34th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.