Ethiopia vs Seychelles: Time required to deal with construction permits
Ethiopia
128 days
in 2012
Seychelles
126 days
in 2012
Ethiopia rank
35th
Seychelles rank
37th
Time required to deal with construction permits over time
- Ethiopia
- Seychelles
How they compare
Ethiopia currently reports 128 days against 126 days in Seychelles, a difference of 2 days.
Across all 8 years both countries report, Ethiopia has been ahead every year.
Ethiopia ranks 35th and Seychelles ranks 37th of 50 countries.
Ethiopia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Ethiopia | Seychelles | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 128 days | 126 days | 2 days | Ethiopia |
| 2010s | 128 days | 126.33 days | 1.67 days | Ethiopia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Ethiopia or Seychelles?
- Ethiopia, at 128 days against 126 days in Seychelles as of 2012.
- What is the difference in time required to deal with construction permits between Ethiopia and Seychelles?
- 2 days, with Ethiopia ahead.
- How many years of comparable data are there for Ethiopia and Seychelles?
- 8 years are reported by both, from 2005 to 2012.
- How do Ethiopia and Seychelles rank globally for time required to deal with construction permits?
- Ethiopia ranks 35th and Seychelles ranks 37th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.