Gabon vs Ghana: Time required to deal with construction permits

Gabon
243 days
in 2012
Ghana
218 days
in 2012
Gabon rank
11th
Ghana rank
13th

Time required to deal with construction permits over time

  • Gabon
  • Ghana
050100150200250200520082012

How they compare

Gabon currently reports 243 days against 218 days in Ghana, a difference of 25 days.

That makes Gabon's figure about 1.1 times Ghana's.

Across all 8 years both countries report, Gabon has been ahead every year.

Gabon ranks 11th and Ghana ranks 13th of 50 countries.

Gabon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Gabon Ghana Difference Ahead
2000s 243 days 218 days 25 days Gabon
2010s 243 days 218 days 25 days Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Gabon or Ghana?
Gabon, at 243 days against 218 days in Ghana as of 2012.
What is the difference in time required to deal with construction permits between Gabon and Ghana?
25 days, with Gabon ahead.
How many years of comparable data are there for Gabon and Ghana?
8 years are reported by both, from 2005 to 2012.
How do Gabon and Ghana rank globally for time required to deal with construction permits?
Gabon ranks 11th and Ghana ranks 13th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Ghana: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 20 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gabon/ghana/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gabon/ghana/">Gabon vs Ghana: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.