Gabon vs Sierra Leone: Time required to deal with construction permits

Gabon
243 days
in 2012
Sierra Leone
238 days
in 2012
Gabon rank
11th
Sierra Leone rank
12th

Time required to deal with construction permits over time

  • Gabon
  • Sierra Leone
0100200300200520082012

How they compare

Gabon currently reports 243 days against 238 days in Sierra Leone, a difference of 5 days.

The two have swapped places 2 times across 8 shared years of data; in 2005 it was Gabon ahead.

Gabon ranks 11th and Sierra Leone ranks 12th of 50 countries.

Across the 2 decades both report, Gabon averaged higher in 1 and Sierra Leone in 1.

Head to head by decade

Decade Gabon Sierra Leone Difference Ahead
2000s 243 days 248.6 days 5.6 days Sierra Leone
2010s 243 days 238 days 5 days Gabon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Gabon or Sierra Leone?
Gabon, at 243 days against 238 days in Sierra Leone as of 2012.
What is the difference in time required to deal with construction permits between Gabon and Sierra Leone?
5 days, with Gabon ahead.
How many years of comparable data are there for Gabon and Sierra Leone?
8 years are reported by both, from 2005 to 2012.
How do Gabon and Sierra Leone rank globally for time required to deal with construction permits?
Gabon ranks 11th and Sierra Leone ranks 12th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gabon vs Sierra Leone: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gabon/sierra-leone/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gabon/sierra-leone/">Gabon vs Sierra Leone: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.