Gabon vs Sierra Leone: Time required to deal with construction permits
Gabon
243 days
in 2012
Sierra Leone
238 days
in 2012
Gabon rank
11th
Sierra Leone rank
12th
Time required to deal with construction permits over time
- Gabon
- Sierra Leone
How they compare
Gabon currently reports 243 days against 238 days in Sierra Leone, a difference of 5 days.
The two have swapped places 2 times across 8 shared years of data; in 2005 it was Gabon ahead.
Gabon ranks 11th and Sierra Leone ranks 12th of 50 countries.
Across the 2 decades both report, Gabon averaged higher in 1 and Sierra Leone in 1.
Head to head by decade
| Decade | Gabon | Sierra Leone | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 243 days | 248.6 days | 5.6 days | Sierra Leone |
| 2010s | 243 days | 238 days | 5 days | Gabon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Gabon or Sierra Leone?
- Gabon, at 243 days against 238 days in Sierra Leone as of 2012.
- What is the difference in time required to deal with construction permits between Gabon and Sierra Leone?
- 5 days, with Gabon ahead.
- How many years of comparable data are there for Gabon and Sierra Leone?
- 8 years are reported by both, from 2005 to 2012.
- How do Gabon and Sierra Leone rank globally for time required to deal with construction permits?
- Gabon ranks 11th and Sierra Leone ranks 12th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.