Time required to deal with construction permits in Sierra Leone

Sierra Leone: Time required to deal with construction permits was 238 days in 2012. ▬ Flat

Latest (2012)
238 days
Change on year
unchanged
World rank
12th
of 50 countries
All-time high
269 days
in 2008
All-time low
235 days
in 2005
Years of data
8
2005–2012

Time required to deal with construction permits in Sierra Leone, 2005–2012

01002003002005200820122005: 235 days2006: 235 days2007: 235 days2008: 269 days2009: 269 days2010: 238 days2011: 238 days2012: 238 days

Source: World Bank, Doing Business project (http://www.doingbusiness.org/). Measured in days.

Analysis

In 2012, time required to deal with construction permits in Sierra Leone stood at 238 days.

That represents a change of up 1.3% over ten years.

That places Sierra Leone 12th out of 50 countries with data for 2012, putting it in the top quarter.

Averages by decade

DecadeAverage LowestHighest Years
2000s 248.6 days 235 days 269 days 5
2010s 238 days 238 days 238 days 3

Countries ranked near Sierra Leone

  1. 9 Algeria 281 days compare
  2. 10 Sudan 270 days compare
  3. 11 Gabon 243 days compare
  4. 13 Egypt 218 days compare
  5. 13 Ghana 218 days compare
  6. 15 Senegal 210 days compare

See the full ranking of 56 places →

More private sector data for Sierra Leone

All data for Sierra Leone →

Frequently asked questions

What is time required to deal with construction permits in Sierra Leone?
Time required to deal with construction permits in Sierra Leone was 238 days in 2012, according to World Bank, Doing Business project (http://www.doingbusiness.org/).
What is the highest time required to deal with construction permits recorded in Sierra Leone?
The highest recorded value was 269 days in 2008.
What is the lowest time required to deal with construction permits recorded in Sierra Leone?
The lowest recorded value was 235 days in 2005.
How does Sierra Leone rank for time required to deal with construction permits?
Sierra Leone ranks 12th out of 50 countries with data for 2012.
Is time required to deal with construction permits rising or falling in Sierra Leone?
Over the last ten years it is up 1.3%. The long-run trend across the full record is flat.
Where does this Sierra Leone data come from?
The figures come from World Bank, Doing Business project (http://www.doingbusiness.org/), published as part of Time required to deal with construction permits (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 8 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.