Gambia vs Namibia: Time required to deal with construction permits (days)
Gambia
143 days
in 2012
Namibia
139 days
in 2012
Gambia rank
31st
Namibia rank
34th
Time required to deal with construction permits (days) over time
- Gambia
- Namibia
How they compare
Gambia currently reports 143 days against 139 days in Namibia, a difference of 4 days.
The two have swapped places 1 time across 8 shared years of data; in 2005 it was Namibia ahead.
Gambia ranks 31st and Namibia ranks 34th of 50 countries.
Across the 2 decades both report, Gambia averaged higher in 1 and Namibia in 1.
Head to head by decade
| Decade | Gambia | Namibia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 109 days | 143.8 days | 34.8 days | Namibia |
| 2010s | 143 days | 139 days | 4 days | Gambia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time required to deal with construction permits, Gambia or Namibia?
- Gambia, at 143 days against 139 days in Namibia as of 2012.
- What is the difference in time required to deal with construction permits between Gambia and Namibia?
- 4 days, with Gambia ahead.
- How many years of comparable data are there for Gambia and Namibia?
- 8 years are reported by both, from 2005 to 2012.
- How do Gambia and Namibia rank globally for time required to deal with construction permits?
- Gambia ranks 31st and Namibia ranks 34th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.