Gambia, The vs Namibia: Time required to deal with construction permits

Gambia, The
143 days
in 2012
Namibia
139 days
in 2012
Gambia, The rank
31st
Namibia rank
34th

Time required to deal with construction permits over time

  • Gambia, The
  • Namibia
050100150200520082012

How they compare

Gambia, The currently reports 143 days against 139 days in Namibia, a difference of 4 days.

The two have swapped places 1 time across 8 shared years of data; in 2005 it was Namibia ahead.

Gambia, The ranks 31st and Namibia ranks 34th of 50 countries.

Across the 2 decades both report, Gambia, The averaged higher in 1 and Namibia in 1.

Head to head by decade

Decade Gambia, The Namibia Difference Ahead
2000s 109 days 143.8 days 34.8 days Namibia
2010s 143 days 139 days 4 days Gambia, The

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time required to deal with construction permits, Gambia, The or Namibia?
Gambia, The, at 143 days against 139 days in Namibia as of 2012.
What is the difference in time required to deal with construction permits between Gambia, The and Namibia?
4 days, with Gambia, The ahead.
How many years of comparable data are there for Gambia, The and Namibia?
8 years are reported by both, from 2005 to 2012.
How do Gambia, The and Namibia rank globally for time required to deal with construction permits?
Gambia, The ranks 31st and Namibia ranks 34th of 50 countries.
Where does this data come from?
World Bank, Doing Business project (http://www.doingbusiness.org/), published as Time required to deal with construction permits (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Gambia, The vs Namibia: Time required to deal with construction permits. Statizoid, drawing on World Bank, Doing Business project (http://www.doingbusiness.org/). Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gambia-the/namibia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/time-required-to-deal-with-construction-permits-days/gambia-the/namibia/">Gambia, The vs Namibia: Time required to deal with construction permits</a> — Statizoid

About this data

Indicator
Time required to deal with construction permits (days)
Unit
days
Source
World Bank, Doing Business project (http://www.doingbusiness.org/)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
56 places, 447 data points, 2005–2012
Last refreshed

The total number of days required to build a warehouse. The measure captures the median duration that local experts indicate is necessary to complete a procedure in practice.